SERVICE
Additions and Basements
12–24 weeks
Basements from $40,000; additions scoped separately
Plan added living space or finish a basement for a guest suite, office or family room.
Additions and basements cover added living space or a finished basement for a guest suite, office or family room. Typical timelines run 12–24 weeks; basements start from $40,000, and additions are scoped separately because each one depends on the site and the connection to the existing house. A site measure comes first, followed by a written range that lists the included work. Permit coordination is part of the agreed scope where the work requires it.
Added living space or a finished basement.
Written range after site measure; additions scoped separately.
Permit coordination where required.
What is included
Design, engineering and permits
Foundation, framing and insulation
Heating, electrical and finishes
Inspections included in scope
Estimate this service
PROCESS
How the work runs
1 Week 1
Consult
2 Week 2
Measure
3 Weeks 3–4
Design
4 Week 5
Demolish
5 Weeks 6–11
Build
6 Week 12
Handover
Ready to price your room?
Build your estimate
2026 All rights reserved. Estimates are indicative and not a contract.


