Estimate-first renovation
Your renovation, priced before it starts.
10-year
Workmanship warranty
Weekly
Written site updates
Fixed price
Set before demolition
[01] ESTIMATE
Build a Planning Estimate
Planning range, not a quote.
A fixed price follows the site measure.
Permits and clean-up are in scope.
[02] BY THE NUMBERS
The Numbers Before Demolition
10
Years of workmanship warranty
52
Written site updates a year
8–12
Weeks for a typical kitchen build
3
Finish grades, priced line by line
[03] SERVICES
Rooms We Work On

Kitchen Remodels
Rework layouts, cabinets, counters, lighting and appliances, with permit coordination included in the agreed scope.
8–12 weeks
From $35,000

Bathroom Renovations
Update primary baths and hall baths, including tile, ventilation, plumbing fixtures and storage.
6–9 weeks
From $25,000

Whole-Home Renovations
Coordinate room-by-room updates, electrical and finish work around one documented scope and schedule.
12–24 weeks
From $120,000

Additions and Basements
Plan added living space or finish a basement for a guest suite, office or family room.
12–24 weeks
Basements from $40,000; additions scoped separately
[04] SELECTED WORK
U-Shaped Kitchen Refresh · Portland, OR · 8 weeks →
Seattle, WA
Primary Bath Update
Replaced the tub, added a tiled shower and improved storage in a lived-in home.
Portland, OR
1960s Ranch, Room by Room
Updated flooring, lighting and kitchen finishes while keeping the home's existing footprint.
See all projects
[05] PROCESS
A Schedule With Named Leads
One named lead from consult to handover.
A written site update every week.
Typical kitchen: twelve weeks.
[06] FINISH GRADES
Compare Finish Allowances
Allowances listed line by line.
Switch grade until design sign-off.
The grade you pick feeds the estimate.
[07] SERVICE AREA
Check Your ZIP Code
Crews in Portland, Vancouver and Seattle.
Typical start in three to five weeks.
Not on the list? Ask, we add areas by demand.
[08] REVIEWS
Homeowner Notes
The weekly note made it clear what was happening next. The crew kept the kitchen usable for as long as they could.
Mara, kitchen project
They explained the permit steps and gave us a schedule we could plan around. The bathroom took eight weeks.
Dylan, bathroom project
We knew who to call when a question came up. The final scope matched what we had agreed to.
Jo and Peter, basement project
[09] ASSURANCE
The Work, Covered
License
We share our Oregon contractor license details before contract signing and coordinate required permits for the agreed scope.
Insurance
We can provide current insurance details before work begins. Ask us for the certificate during planning.
Warranty
Our workmanship warranty covers qualifying work for 10 years. Product warranties follow the terms set by each manufacturer.
[10] QUESTIONS
Questions Before We Visit
How does the calculator estimate my project?
It uses room type, approximate area and finish grade to show a planning range and build weeks. We confirm price after a site measure and written scope.
Do you handle permits?
Yes. We coordinate permit applications and inspections included in the agreed scope. Requirements depend on the work and the property’s location.
How long will my project take?
A typical kitchen takes 8–12 weeks, and a primary bath takes 6–9 weeks. The written schedule accounts for scope, permits and material lead times.
Can I stay in my home during construction?
Often, yes. We discuss access, dust control, water or power interruptions and temporary room closures before the work begins.
Which ZIP codes do you serve?
Use the ZIP check to see whether your address is in our service area. We confirm travel and permit requirements before scheduling a site visit.
What does the 10-year warranty cover?
It covers qualifying workmanship on our contracted work. Materials and fixtures follow their manufacturers’ warranty terms; we provide the written details at handover.
[11] START
Start With Your Room
2026 All rights reserved. Estimates are indicative and not a contract.





