Bathroom

Primary Bath Update

Finished primary bathroom with a walk-in glass shower and a wood double vanity
Finished result

Location

Seattle, WA

Duration

7 weeks

Budget

$40k - $80k

Space

Bathroom

THE PROJECT

In a 96-square-foot Seattle bathroom, replacing the tub and adding a tiled shower meant reworking the room rather than swapping fixtures. The goal was a primary bath that worked harder without gaining floor area, so storage moved into the walls and the shower took the space the tub had used. The home stayed occupied throughout the seven weeks, which shaped the schedule as much as the construction did — the room was out of service for most of that time, and the sequence was set so the household always knew what came next. The written range was $40k–$80k after the site measure, and permit coordination was handled within the agreed scope.

Scope of work

  • Replaced the tub with a tiled walk-in shower

  • New vanity with added drawer storage

  • Ventilation fan sized to the room

  • Tile, waterproofing and plumbing fixtures

  • Heated floor and new lighting

Estimate a similar project

Finished result
Finished result

CLIENT NOTE

They explained the permit steps and gave us a schedule we could plan around. The bathroom took seven weeks.

Dylan, Seattle

Scopeline Build Co.

Kitchens, baths and whole-home renovations, built on schedule and priced up front.

Contact

(555) 010-2480

hello@scopeline.example

418 Alder Street, Portland, OR 97205

Credentials

Licensed, bonded and insured - CCB #214500

2026 All rights reserved. Estimates are indicative and not a contract.

Create a free website with Framer, the website builder loved by startups, designers and agencies.