Kitchen

Galley Kitchen Rework

Finished galley kitchen with wood cabinets, a gas range and large windows
Typical starting point
Typical starting point
Finished result
Comparison position 50 percent

Location

Portland, OR

Duration

11 weeks

Budget

$80k - $150k

Space

Kitchen

THE PROJECT

This 1940s galley kitchen in Portland was narrow by design, and the work was about opening it up without pretending the room was larger than it is. New cabinets, counters and task lighting replaced the old layout across roughly 210 square feet. The project ran eleven weeks, with the written range set at $80k–$150k after the site measure. The written range was revisited at the measure, before any order was placed. Permit coordination was part of the agreed scope. The result is a kitchen that keeps its original footprint but reads as one continuous work area rather than a corridor.

Scope of work

  • Opened the wall between the galley and dining area

  • New cabinets, quartz counters and task lighting

  • Relocated the range hood and rerouted ventilation

  • Updated electrical and added dedicated circuits

  • Refinished floors and repainted adjoining rooms

Estimate a similar project

Finished result
Finished result

CLIENT NOTE

The weekly note made it clear what was happening next, and the kitchen stayed usable for as long as it could.

Mara, Portland

Scopeline Build Co.

Kitchens, baths and whole-home renovations, built on schedule and priced up front.

Contact

(555) 010-2480

hello@scopeline.example

418 Alder Street, Portland, OR 97205

Credentials

Licensed, bonded and insured - CCB #214500

2026 All rights reserved. Estimates are indicative and not a contract.

Create a free website with Framer, the website builder loved by startups, designers and agencies.